Operations Management, Global Edition 12Th Edition By William Stevenson – Test Bank

Original price was: $25.00.Current price is: $22.00.

Edition: 12th Edition

Format: Downloadable ZIP File

Resource Type: Test Bank

Duration: Unlimited downloads

Delivery: Instant Download

Category:
Description

Operations Management, Global Edition 12Th Edition By William Stevenson – Test Bank

Chapter 06

Process Selection and Facility Layout


True / False Questions

1.

Continuous processing is the best way to produce customized output. 
 
True    False

2.

As a general rule, continuous processing systems produce products for inventory rather than for customer order. 
 
True    False

3.

A job-shop processing system generally requires less-skilled workers than a continuous processing system. 
 
True    False

4.

Avoiding bottlenecks is the primary goal of product design. 
 
True    False

5.

In general, job-shop systems have a lower unit cost than continuous systems do because continuous systems use costly specialized equipment. 
 
True    False

6.

Continuous production has been a significant factor underpinning the U.S. standard of living over the last century. 
 
True    False

7.

Right-sized equipment tends to be larger than equipment used in traditional process layouts. 
 
True    False

8.

Intermittent processing can take the form of batch processing or a job shop. 
 
True    False

9.

The term “computer-aided manufacturing” refers primarily to the use of robotics in process control. 
 
True    False

10.

Flexible manufacturing systems bring the benefits of automation to continuous processes. 
 
True    False

11.

Repetitive processing systems usually produce goods specifically for customer orders rather than for inventory. 
 
True    False

12.

Morale problems can be a reason for redesign of a facility layout. 
 
True    False

13.

There are three basic process types: input, processing, and output. 
 
True    False

14.

A cafeteria line would be an example of a process-focused layout. 
 
True    False

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Operations Management, Global Edition 12Th Edition By William Stevenson – Test Bank”

Your email address will not be published. Required fields are marked *

Shipping & Delivery

MAECENAS IACULIS

Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.

ADIPISCING CONVALLIS BULUM

  • Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
  • Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
  • Diam parturient dictumst parturient scelerisque nibh lectus.

Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.